火口的两个人末减|草莓香蕉丝瓜秋榴莲大全|国产一级高清大片|www123|久久久久精品中文字幕一区|安娜德阿玛斯|欧美末成年videos丨

Baolong Fuyang Project

Construction time:2014 Location:Fuyang, Hangzhou

The total site area is 59280㎡(88.9 mu). Overall building area is 192820㎡ including 148200㎡overground area and 44620㎡underground area.For the whole project, the building density is 40.20%; the greening ratio is 20% and the plot ratio is 2.5. For residential building part, the building density is 30%; the greening ratio is 30% and the highest building is of 94.1m height.
This project is divided into residential and commercial district according to function. The plot has high-rise residential area at southeast while northeast side is 2-3 floors commercial podium which connects westen shopping centre through the corridor to form a overall commercial atmosphere.

Related news:
Last one:
Next article: