火口的两个人末减|草莓香蕉丝瓜秋榴莲大全|国产一级高清大片|www123|久久久久精品中文字幕一区|安娜德阿玛斯|欧美末成年videos丨

Carl Zeiss Dragon project

Construction time:To be decided Location:Waigaoqiao, Shanghai

The plant site of the project is located at Shanghai Waigaoqiao free trade zone. Total land occupation area of the plant is about 21,118m2. Total floor areais 16,398m2. Main buildings include a main production building, two gatehouses, a fire pump room and pool.

Related news:
Last one:
Next article: